By Gabriel Cavalcante, owner of GCM Best Services Corp · November 28, 2026

In Short

If you want a new paver patio, pool deck or driveway ready for spring in Central Florida, start planning in January. Several steps come before anyone digs: a free written estimate, choices on layout, material, color and border, and often an HOA architectural review and a city or county permit. How long those approvals take varies by HOA and by city, so ask yours early. The National Weather Service office in Melbourne lists May 27 as the median start of Orlando's wet season, so planning in January gives the paperwork and the installation a better chance of fitting into the drier months.

Why start in January

Spring is when most homeowners want to use their outdoor space, and that is when interest in new pavers peaks. In Google Trends data for the Orlando area, averaged over five years, search interest in pavers is lowest in December and highest in April and May. If you start planning when everyone else does, your approvals begin just as the rainy season gets close.

The installation is the last step. Before it come the estimate, the design choices, the HOA review if your community has one, and a permit if your city or county requires one. Each HOA and permit office works on its own timeline. Ask yours how long a review usually takes, and plan around that answer.

Central Florida weather: the dry months and the rainy season

The National Weather Service office in Melbourne tracks when Central Florida's wet and dry seasons begin. For Orlando, it lists May 27 as the start of the wet season and October 15 as the start of the dry season, based on records from 1950 to the present. Both are median dates: in half of the years the season starts earlier, and in the other half it starts later. Source: NWS Melbourne, Wet/Dry Season Onset.

Weather matters for pavers at two points. The bedding sand is screeded only over the area that will be paved that day, because rain, people and animals disturb it, and polymeric sand goes into dry joints. Pavers can be installed in summer too, but rain makes the schedule harder to predict.

Decisions to make in January

You don't need every answer before you ask for an estimate. The more of these you settle, though, the more accurate the estimate and the HOA package will be.

Which project

Start with the area: a patio, a pool deck, a driveway, a walkway, or more than one. Areas that connect, like a patio and the walkway that leads to it, are easier to plan together, so they share one layout, one material and one HOA submittal.

Size and layout

Let the way you use the space set its size. Before choosing a material, list what goes on it: a dining table, lounge chairs, a grill. Measure the furniture with the chairs pulled out, note where the afternoon shade falls, and mark the paths people walk to the doors, the pool and the yard. Many Central Florida backyards end at a screened lanai or a pool cage, so the new surface has to work around the enclosure posts and the height of the existing slab. See our guide to planning an outdoor living space.

Material

Concrete pavers come in the widest range of shapes and colors, and they suit Florida's sandy soil well because each unit can move slightly and be reset. See paver installation.

Travertine is a natural stone that stays comfortable under bare feet, which makes it the usual choice where a patio meets the pool. It is porous, so it is sealed and kept clean of leaf and rust stains. See travertine vs porcelain vs marble for pool decks.

Large-format porcelain gives a clean, modern look and absorbs very little water. Large slabs need a flat, stable base, and outdoor porcelain should have a textured finish made for wet areas. See our large-format porcelain guide.

In the Florida sun, color matters too: lighter blends stay cooler underfoot than dark ones.

Wide two-tone paver driveway with dark bands leading to the garage
Driveway: a light gray field with dark contrast bands
Travertine pool deck with outdoor seating inside a screened pool enclosure
Pool deck: travertine around a screened pool

Color and border

Pick a field color first, then decide on a border. A soldier course or a band in a contrasting color frames the edge, and on a large driveway the same contrasting color can run as bands through the field. Paver color varies from pallet to pallet, so installers pull pavers from at least three pallets at a time to spread the variation evenly across the surface. Look at samples outdoors, in daylight, next to the house. See paver patterns and borders.

Close-up of textured gray pavers with a darker border course along the edge
Textured pavers with a darker border course
Round paver patio with a dark border ring, a curved seat wall and a fire pit under a tree
A dark border ring frames a round patio

Drainage and slope

Before the design is final, note where rain stands in the yard today. The new surface is sloped so water runs away from the house and the doors, commonly about 1/8 inch per foot on a patio, and the finished surface stays below the interior floor at the threshold. Downspouts that empty onto the pavers are easier to solve in the plan than after the work. Florida has no freeze-thaw cycles, but heavy rain, sandy soil and a high water table make slope and drainage the details to get right. For driveways, see driveway drainage in Florida.

What to plan at the same time

Anything that runs under the surface is far easier to put in before the base goes down than to tunnel under a finished patio. Decide on these in January, even if some of them get built later:

  • Lighting wire. Path, step and pillar lights, or lights set into the pavers, need wire or conduit under the surface. See outdoor lighting.
  • A gas line for a fire feature. A gas fire pit needs a line installed by a qualified gas contractor under permit; we lay out the patio around it. See fire pits and how a fire pit is built on a paver patio.
  • Irrigation changes. If sprinkler lines or heads sit where the new surface will go, plan how they will be moved or capped before excavation starts, and who will do it.
  • Seat walls and steps. A seat wall is heavy block, so it sits on the compacted base instead of loose sand. Plan seat walls and steps in the same layout as the patio.
Travertine pool deck with a channel drain across it, inside a screened pool enclosure
A channel drain set into a travertine pool deck
Lit cap on a driveway pillar and small lights set into a paver driveway at night
A pillar light and small lights set into the pavers, at night

What happens before installation

  1. Free written estimate. Send photos and the rough size of the area by text or WhatsApp to (407) 250-1948, call, or use the contact form. Tell us the material, whether you want a border and what is there now (grass, concrete or old pavers). The written estimate lists the area, material, border and any site work, such as breaking out an old slab or drainage work.
  2. Measurements. Final quantities come from measuring the area, the slope and the height at each door threshold.
  3. HOA submittal package. A typical package includes a dimensioned layout, the paver or stone name and color, and the manufacturer's spec sheet or a sample. Your HOA's own application form is the final word on what it wants. We prepare the scope, layout and material details; the approval itself stays with your association.
  4. Permit, when one is required. The rules depend on which city or county covers your address. Inside City of Orlando limits, the city requires an engineering permit application to install or remove pavers or to expand a driveway. In unincorporated Orange County, the county says pavers require a zoning permit only. Other cities and counties have their own process, so check with yours. Sources: City of Orlando Engineering Permit Guide; Orange County, Do I Need a Permit?
  5. Scheduling. Once the estimate is accepted and the approvals are in, the installation goes on the schedule. Weather and approvals set the actual date.

How a paver installation is built

A paver surface is a layered system: base, bedding layer, pavers, edge restraint and joint material. If one fails, the whole surface fails. Here is how it goes in:

  1. Excavation. The depth is the base thickness, plus 1 inch of bedding sand, plus the thickness of the paver, with more where the soil is poor. Loose soil comes out and the exposed ground is compacted. On clay, silt or ground that stays wet, a geotextile fabric goes down first.
  2. Compacted crushed-stone base. Crushed stone with fines goes in layers of even thickness, each compacted with a vibratory plate until the plate starts to bounce instead of sinking. The Concrete Masonry & Hardscapes Association lists a minimum base of 4 inches under patios and walkways and 6 inches under residential driveways in ideal conditions, with more where the soil is weak or drains poorly. The base runs past the edge of the paving by about its own thickness, so the edge restraint has solid ground to anchor into, and the slope is set in the top layer. Source: CMHA, paver base and depth.
  3. 1 inch of bedding sand. Coarse concrete sand is screeded flat using 1-inch pipes as guides. Too much sand and the pavers settle unevenly; too little and they do not lock together.
  4. Pavers and cuts. Laying starts from a fixed edge, such as the house, to reduce cuts. Pavers are pulled from at least three pallets at a time and cut with a wet saw.
  5. Edge restraint. It runs along every edge that does not sit against the house, a wall or a step. It is fixed into the base, not the sand, and it goes in before the final compaction.
  6. Compaction. The clean surface is compacted with a paver roller or a padded plate, in two or three passes in different directions, which levels the pavers and works sand up into the joints.
  7. Polymeric sand. It is swept into dry joints, compacted, topped up and finished 1/8 inch below the top of the paver, then wetted from the lowest point following the sand maker's instructions. Sand left too high in the joints is the most common failure.

Built this way, pavers can be lifted and reset if a section ever needs repair. See how long pavers last in Florida.

A simple timeline: January to May

Use this as a starting point and adjust it to your HOA and your city.

MonthWhat to do
JanuaryChoose the project. Take photos, measure roughly and request a free written estimate. Ask your HOA for its review form and how long reviews take, and ask your city or county whether you need a permit.
FebruarySettle the layout, material, color and border. Decide on lighting wire, a gas line, irrigation changes and seat walls. Put the HOA package together and submit it.
MarchFollow up on the HOA review and any permit. Once approvals are in, the installation goes on the schedule. Clear furniture and planters from the work area.
April and MayThe target window for installation, before the wet season that NWS Melbourne dates to a median start of May 27 in Orlando. Approvals and weather set the actual date.

Starting later than January? The steps stay the same; the window before the summer rains is shorter.

Paver projects across Central Florida

We build paver patios, pool decks and driveways across Orlando and Central Florida:

Frequently Asked

When should I start planning a spring paver patio in Central Florida?

January is a good time to start. The estimate, the design choices, HOA review and any permit all come before installation, and approval times vary by HOA and by city. Starting early gives those steps room before the wet season, which the National Weather Service office in Melbourne dates to a median start of May 27 in Orlando.

Do I need a permit to install pavers in Orlando?

It depends on where the home is. Inside City of Orlando limits, the city requires an engineering permit application to install or remove pavers or to expand a driveway. In unincorporated Orange County, pavers require a zoning permit only. Other cities and counties have their own rules, so check with the one that covers your address.

Does my HOA need to approve a new patio or driveway?

In many Central Florida communities, yes. HOAs often approve the material, color and footprint before work starts. We prepare the layout and material details for the architectural review; the approval itself stays with your association. Review times vary, so ask yours early.

Can pavers be installed during the rainy season?

Yes, but rain makes the schedule harder to predict. Bedding sand is prepared only for the area that will be paved that day, and polymeric sand goes into dry joints, so a storm can push a step to the next dry day. Planning in January gives your project a better chance of being built in the drier months.

What should I plan at the same time as a new paver patio?

Anything that runs under the surface: lighting wire, a gas line for a fire feature and irrigation changes. These are far easier to handle before the base goes down than after. A gas line is installed by a qualified gas contractor under permit. Seat walls, steps and a fire pit belong in the same layout, so the finished space reads as one design.

Related

Explore more

About the author

Gabriel Cavalcante is the owner of GCM Best Services Corp, a Florida corporation founded in November 2022 and based in Orlando. GCM installs paver and travertine patios, pool decks, driveways, concrete and artificial turf across Central Florida. More about GCM.

Free Written Estimate

Planning a spring paver project?

Tell us about your patio, pool deck or driveway and get a free written estimate to start the planning early.

WhatsAppCall